| |
|
STATUS OF ROADS IN SIKKIM
ROAD MAINTAINED BY ROADS & BRIDGES (SPWD)
Length of Road by Type |
| |
|
SL.NO. |
ROAD PARTICULARS |
UNIT |
1997-98 |
1998-99 |
1999-2000 |
2000-01 |
|
|
|
|
|
|
|
|
|
1 |
National High Way |
KM |
- |
- |
- |
- |
|
|
|
|
|
|
|
|
|
2 |
State High Way |
KM |
186 |
186 |
186 |
186 |
|
|
|
|
|
|
|
|
|
|
Surfaced |
KM |
186 |
186 |
186 |
186 |
|
|
Unsurfaced |
KM |
- |
- |
- |
- |
|
|
|
|
|
|
|
|
|
3 |
Major District Roads |
KM |
476 |
442 |
442 |
464 |
|
|
|
|
|
|
|
|
|
|
Surfaced |
KM |
318 |
284* |
284 |
306 |
|
|
Unsurfaced |
KM |
158 |
158 |
158 |
158 |
|
|
|
|
|
|
|
|
|
4 |
Other District Roads |
KM |
1085.35 |
1104.35 |
1120.35 |
1179.35 |
|
|
|
|
|
|
|
|
|
|
Surfaced |
KM |
345.35 |
367.35 |
379.35 |
438.35 |
|
|
Unsurfaced |
KM |
740.00 |
737.00 |
741.00 |
741.00 |
|
|
|
|
|
|
|
|
|
5 |
Bridle Roads |
KM |
28 |
28 |
28 |
28 |
|
|
|
|
|
|
|
|
|
|
Surfaced |
KM |
- |
- |
- |
- |
|
|
Unsurfaced |
KM |
28 |
28 |
28 |
28 |
|
|
|
|
|
|
|
|
|
|
TOTAL SURFACED ROAD |
KM |
849.35 |
837.35 |
849.35 |
930.35 |
|
|
TOTAL UNSURFACED ROAD |
KM |
926.00 |
923.00 |
927.00 |
927.00 |
|
|
|
|
|
|
|
|
|
|
Total Roads Maintained by Road &
Bridges (SPWD) |
KM |
1775.35 |
1760.35 |
1776.35 |
1857.35 |
|
| |
NOTE: *34 KM Road was transferred to BRO during 1998-99
(Rangpo Rorathang) - 12 KM Dikchu Sangkalang - 22 KM |
| |
| |
|
ROAD MAINTAINED / UNDER-CONSTRUCTION OF
BORDER ROAD ORGANISATION (SIKKIM) AS ON 31.03.2000 |
| |
|
SL.NO. |
PARTICULARS |
UNIT |
MAINTAINED BY BRO |
ROAD UNDER CONSTRUCTION |
TOTAL |
|
|
|
|
EAST DIST. |
NORTH
DIST. |
EAST
DIST. |
NORTH DIST. |
|
|
|
National
Highway(31 A ) |
KM |
41 |
|
|
|
41 |
|
|
|
|
|
|
|
|
|
|
|
Road other
than National Highway : |
|
|
|
|
|
|
|
|
(a) Surfaced |
KM |
238 |
339.10 |
|
|
577.10 |
|
|
(b) Unsurfaced |
KM |
- |
- |
11 |
42 |
53 |
|
|
|
|
|
|
|
|
|
|
1 |
Indira-Bye-Pass |
KM |
10 |
- |
- |
- |
10 |
|
2 |
Northen-Bye-Pass |
KM |
5 |
- |
- |
- |
5 |
|
3 |
Gangtok-Sherbathan |
KM |
46 |
- |
- |
- |
46 |
|
4 |
Sherbathang-Kupup |
KM |
8 |
- |
- |
- |
8 |
|
5 |
Rishi-Rhenok |
KM |
5 |
- |
- |
- |
5 |
|
6 |
Rhenok-Rongli-Kuekhola |
KM |
29 |
- |
- |
- |
29 |
|
7 |
Ranipul-Rhenok |
KM |
46 |
- |
- |
- |
46 |
|
8 |
Lungthu-Kupup |
KM |
16 |
- |
- |
- |
16 |
|
9 |
Kuekhola-Lungthu |
KM |
36 |
- |
- |
- |
36 |
|
10 |
Laxman-Chowk-Tukla |
KM |
6 |
- |
- |
- |
6 |
|
11 |
Kyangnosa-Menla |
KM |
5 |
- |
- |
- |
5 |
|
12 |
Kupup-Rajdhani |
KM |
5 |
- |
- |
- |
5 |
|
13 |
Sorsoi-Bowl-Saragari |
KM |
5 |
- |
- |
- |
5 |
|
14 |
Rhenok-Aritar |
KM |
5 |
- |
- |
- |
5 |
|
15 |
Tamze-Chola |
KM |
9 |
- |
- |
- |
9 |
|
16 |
Approach Rd to
Swastik |
KM |
2 |
- |
- |
- |
2 |
|
17 |
Gangtok-Chungthang |
KM |
|
96 |
- |
- |
96 |
|
18 |
Chungthang-Lachung |
KM |
|
28 |
- |
- |
28 |
|
19 |
Chungthang-Lachen |
KM |
|
22 |
- |
- |
22 |
|
20 |
Dvsn
Chungthang-Lachen |
KM |
|
3 |
- |
- |
3 |
|
21 |
Lachung-Yumthang |
KM |
|
24 |
- |
- |
24 |
|
22 |
Lachung-Zekuphyak-Katao |
KM |
|
32 |
- |
- |
32 |
|
23 |
Mangan-Sanklang |
KM |
|
7.10 |
- |
- |
7.10 |
|
24 |
Lachen-Kalep |
KM |
|
31 |
- |
- |
31 |
|
25 |
kalep-Giagong |
KM |
|
21 |
- |
- |
21 |
|
26 |
Yumthang-Yumesomdong(s) |
KM |
|
14 |
- |
- |
14 |
|
27 |
Camp Katar
Helipad |
KM |
|
1 |
- |
- |
1 |
|
28 |
Singtam-Dikchu |
KM |
|
33 |
- |
- |
33 |
|
29 |
Y (S) - Y (N) |
KM |
|
12 |
- |
- |
12 |
|
30 |
Dikchu-Rang Rang |
KM |
|
7 |
- |
- |
7 |
|
31 |
Katao-Base-Tankrala-Patala |
KM |
|
5 |
- |
- |
5 |
|
32 |
3 Km beyond Y(N)
to GRI 189284 |
KM |
|
3 |
- |
- |
3 |
|
33 |
Sanklang-Toong |
KM |
|
- |
- |
*42 |
42 |
|
34 |
Rangpo-Rorathang |
KM |
|
- |
*11 |
- |
11 |
|
| |
SOURCE: PROJECT SWASTIK, GANGTOK
NATIONAL HIGHWAY = 41.00 Km, SURFACED ROAD = 577.10 Km , * UNSURFACED
ROAD = 53 Km
TOTAL ROAD LENGTH = 671.10 Km |
| |
| |